Weather Still An Obstacle, But We Are Determined

Knoxville Collage 1

Knoxville, like the rest of the Southeast, was hit with yet another snow storm. This storm brought as much as 5 inches of snow to the area. This storm impacted work at UT Commons. We are starting to see warmer weather so our hopes are up that Mother Nature will play nice in the coming weeks. Updates on progress follow:

Northern Retail Center:

  • Brick work at atrium ongoing
  • Framing/sheathing of rear atrium tall wall complete
  • Internal atrium upper and lower rooms and elevator shaft walls ongoing
  • Interior sheetrock finish work near completion; wall sanding to begin next week
  • Painting of ceiling ongoing
  • EFIS work ongoing

Southern Retail Center:

  • Phase one of roofing operation complete
  • Overhead MEP rough-in ongoing
  • Plumbing drain installation ongoing
  • Layout and forming for topping slab started
  • Generator pad forming ongoing
  • Secondary conduit from transformer complete
  • Conduits for generator feeds complete
  • RTU and mechanical curbs on roof
  • Block work at loading dock complete
  • Steel erection at loading dock ongoing
  • Steel erection for atrium ongoing
  • Brick work ongoing

Shops  A:

  • Footings complete
  • Steel erection to start this weekend

Shops B:

  • Upper level slab pour complete
  • Street level underground MEP complete
  • Sheathing of exterior upper walls ongoing
  • Fine grading for lower level slab to start on Monday
  • RTU curb installation ongoing

Shops C:

  • Framing and sheath of parapet wall near completion
  • Underground MEP rough-in ongoing

Shops D:

  • Final grading of pad to start next week
  • Footing to follow

Shops E:

  • Steel erection ongoing

Parking Deck:

  • Fine grading of last light duty paving slab complete – Pour scheduled for Monday of next week
  • Last Transformer Pad pour
  • Parking deck lighting ongoing