Rooftop Equipment Lift Sets New Record for Stewart Perry

UT Commons Collage 1UT Commons Collage 2

The last few weeks have been special here in Knoxville. Last week, a 550-ton capacity crane was moved onsite for a special lift of the rooftop units at the southern retail center. This process involved over 12 truck loads of crane parts that we assembled onsite. This was followed by 5 more loads of equipment including a generator, refrigeration equipment and HVAC units that were placed on the roof of the adjacent building.

The use of this large crane was required as the back of the mall is inaccessible for heavy equipment. The crane include over 200 feet of boom to reach the rear of the building.

Progress in other areas of the project included the following:

Shops A:

  • Steel erection complete
  • Underground MEP work ongoing

Shops B:

  • Interior framing of upper level shops
  • Brick work on upper level
  • Overhead MEP ongoing
  • Lower floor slab poured
  • Lower level overhead MEP
  • Lower level framing
  • Roofing ongoing

Shops C:

  • Slab on grade poured
  • Framing of walls ongoing
  • Overhead MEP ongoing
  • Roofing ongoing

Shops D:

  • Footing complete
  • Steel erection ongoing

Shops E:

  • Steel erection complete
  • Topping slab poured

Northern Retail Center:

  • Final painting ongoing
  • Novar controls – termination in progress
  • Atrium cart lift install started
  • EFIS – ongoing at atrium
  • Brick complete at atrium
  • Cart curbs poured in atrium
  • Subway – In-wall inspections complete
  • Office areas – above ceiling inspections complete
  • Bathroom tile work to start next week

Southern retail Center

  • Atrium second level floor poured
  • Second level patio poured
  • Overhead MEP ongoing
  • Interior wall framing ongoing

Site work:

  • Cable TV/date system conduit install
  • Site lighting conduit started
  • Utility tie to shops ongoing