A Burst of Activity at UC Commons – Knoxville

UT Commons Collage 1-10-14Knoxville Collage 1-10-14 2

With the holidays and the arctic blast that brought snow and temperatures near O degrees is behind us, the pace of work has picked up.

On the northern retail center:

  • Framing and roof deck of the high atrium progressed.
  • Brick masons are making progress, revealing part of the finished fa├žade.
  • EFIS crews have start at the rear of the building.
  • Concrete crews are forming ramps at doorways.
  • Interior wall framing moves forward.
  • In-wall MEP rough-ins are ongoing.
  • Overhead MEP rough-ins are nearing completion

Lower retail shops:

  • At the 2 level retail (shops B), steel erection crews are busy installing metal decking on both the roof and the second floor.
  • Steel is arriving for shops C and E.

Southern retail center:

  • Steel erection has started inside the block outer walls.
  • Brick crews are setting up scaffold for the brick veneer.
  • Concrete crews are working at the rear of the building completing formwork for the concrete pour of the loading dock area.