Rising to New Heights

Knoxville Collage 1 12-29-13

Production during the holidays can be difficult, but our crews have worked hard, taking only a few days to spend with their families. On the atrium of the northern retail center, the tall roof metal truss system was set in place. This set the top elevation of that building 70 feet above the ground floor. The final stud framing will reach an additional 7 feet.

On the ground floor, concrete crews were busy forming for the atrium slab-on-grade pour. Steel crews are back onsite and have started erection of the frame work for the second level.

On the southern end of the project, masons moved forward laying block for that major retail center. Steel erection is scheduled to begin the week after New Year’s. Concrete crews also poured the first of two concrete handrails at the ramp to the rear of the project. Work inside the project has include the completion of the topping slab for the northern retail center. Stud walls are being installed as well as in-wall and overhead MEP rough-in.